Row of titanium-class CRPS power supply modules installed in a data center rack
CRPS · M-CRPS · 80 PLUS Titanium

Titanium-Class CRPS Power for GPU-Dense Racks

From 550W classic CRPS to 5.5kW M-CRPS — 96% peak efficiency at 50% load, PMBus telemetry, and hot-swap N+1 redundancy. One supplier across the rack power chain.

Wattage Roadmap

One Ladder, Every Rack Segment

550W800W1300W1600W2000W2400W 3.3kW*5.5kW* 8kW**12kW**33kW shelf**

* Development samples, available for joint evaluation  ·  ** Roadmap, offered as joint development with lead customers

96%Peak efficiency at 50% load — 80 PLUS Titanium (230V internal redundant)
2400WTop of the CRPS series in volume production today
73.5×40×185mm — the standard CRPS-185 envelope, 1U height
5-in-1Protection: OVP, UVP, OCP, OTP and fan-fault detection
Titanium CRPS unit under efficiency test with load cables on a bench
Why Titanium

The Money Math of 96% Efficiency

Titanium moves the 50%-load efficiency bar from roughly 92% (Gold) to 96%. On a 10kW compute load that is about 430 watts of heat you never generate — every hour, on every node.

Across a 100-rack AI cluster, that difference compounds into megawatt-hours per year, smaller cooling budgets, and headroom you can spend on GPUs instead.

Uptime Institute puts the cost of data center downtime near $9,000 per hour. Redundant titanium-class supplies with active current sharing are the cheapest insurance in the rack.

How we reach 96%
SMT production line leading to test and burn-in areas
The Factory Behind It

Four Pillars of Production

SMT + DIP mixed lines feed automated ATE stations; every unit finishes a burn-in cycle in our aging room before the safety lab signs off. Capacity grows with demand — we publish process, not promises.

Tour the Factory
Working With TitanWatt

What an ODM-Ready Partner Looks Like

TitanWattTypical brand-line PSU
Custom output configurationConnector layout, harness and bezel customizable from 100 pcsFixed SKUs, custom at 10k+ pcs
PMBus command tailoringCommand set adapted to your BMC at project startStandard command set only
Certification supportIEC/UL 62368-1 CB, CE, UKCA, FCC, RoHS/REACH; regional certs per market planBase certs only
Engineering responseDirect FAE access, 48-hour reply commitmentTicket queue
Batch traceabilitySerial-level test data retained for every shipmentBatch-level at best
Quick Answers

Frequently Asked

Standard configurations start at 100–500 pcs depending on the wattage segment. Custom output configurations are quoted per project — connector, harness and bezel changes typically carry no MOQ penalty at pilot volumes.
Standard-product samples ship in 2–4 weeks including full test data. Volume production follows in 6–10 weeks depending on the burn-in cycle you specify. Every shipment leaves with serial-level test records.
No — and we say so plainly. They are development samples for joint evaluation with lead customers. The 550W–2400W CRPS series is in production today; we publish the status of every wattage segment on our products page.
Safety and EMC to IEC/UL/EN 62368-1 with CB scheme, CE, UKCA and FCC Part 15 Subpart B; RoHS and REACH compliance. Regional certifications (CCC, KC, BSMI and others) are planned per target market — ask for the current matrix.

All questions →

48-Hour Reply

Powering Your Next Rack?

Tell us your wattage, architecture and volumes. An engineer — not an autoresponder — replies within 48 hours.

  Browse Products